Golden Delta EngineeringSHIP REPAIR

Picture5

PIPING WORK

NAME OF PROJECT: MDC
LOCATION: SILC WORKSHOP
PROJECT DATE: OCTOBER 18, 2022 to OCTOBER 27, 2022

DESCRIPTION OF JOB:

  • SEA WATER BALLAST SYSTEM
Picture7

PIPING WORK

NAME OF PROJECT: SENAR DHF
LOCATION: KULAI, JOHOR
PROJECT DATE: SEPTEMBER 25, 2022

DESCRIPTION OF JOB:

  • TO PROVIDE MANPOWER, CONSUMABLE, & MATERIALS
  • TO RE-WELDING BUILT UP DAMAGE WELDING JOINT 24″ 2 SPOT
  • TO GRIND SMOOTH FLANGE INTERNAL WELDING JOINT

PIPING WORK

NAME OF PROJECT: SENAR DHF
LOCATION: KULAI, JOHOR
PROJECT DATE: SEPTEMBER 20, 2022

DESCRIPTION OF JOB:

  • TO PROVIDE MANPOWER, CONSUMABLE, & MATERIALS
  • TO CUT EXISTING DAMAGED WELDING JOINT
  • TO FIT UP NEW MATERIALS
  • TO WELD NEW JOINT 1″ 2 JOINT
  • TO GRIND SMOOTH FLANGE INTERNAL WELDING JOINT
Picture8

PIPING WORK

NAME OF PROJECT: SENAR DHF
LOCATION: KULAI, JOHOR
PROJECT DATE: SEPTEMBER 7, 2022

DESCRIPTION OF JOB:

  • TO PROVIDE MANPOWER, TOOLS AND CONSUMABLE.
  • TO GRINDING AND REWELDING EXISTING DAMAGE 8 INCH FLANGE
  • TO SMOOTH GRIDING BY USING A SAND PAPER FLAP DISC AT THE REWELDING 8 INCH FLANGE SURFACE
WhatsApp Image 2022-08-09 at 3.02.41 PM

PIPING SUPPORT FABRICATION WORK

NAME OF PROJECT: METHANE NILE EAGLE
LOCATION: SILC WORKSHOP
PROJECT DATE: JULY 21, 2022 to JULY 31, 2022

DESCRIPTION OF JOB:

  • FABRICATION PIPE SUPPORT 129 PIECES
  • WELDING  PIPE SUPPORT 129 PIECES
  • TOTAL FIT-UP AND WELD 7,927.40 KG 

PIPING FABRICATION WORK

NAME OF PROJECT: M.T EDEN
LOCATION: SILC WORKSHOP
PROJECT DATE: JUNE 23, 2022

DESCRIPTION OF JOB:

  • TO PROVIDE MANPOWER, TOOL, COSUMBLE AND MATERIAL TO FABRICATION 4” PIPE SPOOL TOTAL 4 SPOOL WITH PRIMER COAT PAINT

REPAIR WELDING JOB

NAME OF PROJECT: QUANTUM RUBBER SDN BHD.
LOCATION: KULAI, JOHOR
PROJECT DATE: JUNE 13, 2022

DESCRIPTION OF JOB:

  • TO RE-WELDING EXISTING DAMAGE PIPE SPOOL FLANGE JOINT

PIPING WORK

NAME OF PROJECT: MV CMA CGM NABUCCO
LOCATION: TANJUNG PELEPAS MY
PROJECT DATE: JUNE 4, 2022

DESCRIPTION OF JOB:

  • TO PROVIDE MANPOWER AND MATERIAL TO ARRANGE FABRICATION AND INSTALLATION OF THE DISCHARGE PIPE FOR FIRE GS PUMP AS PER THE DRAWING PROVIDED AND SAMPLE OF THE OLD PIPE DURING PORT STAY AT TANJUNG PELEPAS.

REPAIR WELDING JOB

NAME OF PROJECT: QUANTUM RUBBER SDN BHD
LOCATION: SILC WORKSHOP
PROJECT DATE: MARCH 3, 2022

DESCRIPTION OF JOB:

  • TO WELDING 1.1/2” STAINLESS STEEL PIPE SUPPORT INSIDE THE TANK
  • TO RE-WELDING 1.1/2” STAINLESS PIPE SUPPORT INSIDE THE TANK 2 NOS

PIPING FABRICATION, WELDING, AND HYDRO TESTING

NAME OF PROJECT: NAVE BUENA SUERTE
LOCATION: SILC WORKSHOP
PROJECT DATE: APRIL 16, 2021 TO MAY 10, 2021

DESCRIPTION OF JOB:

  • FABRICATION PIPE SPOOL 218 SPOOLS
  • WELDING  PIPE JOINT 616 JOINTS
  • HYDRO TESTING PIPE SPOOL 218 SPOOLS
  • TOTAL FIT-UP AND WELD 2,017.50 DIA-INCH 

EXISTING PIPELINE TEMPLATE; RENEW, WELDING, HYDRO TESTING

NAME OF PROJECT: PREM PRIDE
LOCATION: SILC WORKSHOP
PROJECT DATE: MARCH 23, 2021 TO APRIL 12, 2021

DESCRIPTION OF JOB:

  • FABRICATION PIPE SPOOL 90 SPOOLS
  • WELDING  PIPE JOINT 406 JOINTS
  • HYDRO TESTING PIPE SPOOL 90 SPOOLS
  • TOTAL FIT-UP & WELD 2,823 DIA-INCH 

EXISTING PIPELINE TEMPLATE; RENEW, WELDING, AND HYDRO TESTING

NAME OF PROJECT: USNS TIPPECANOE
LOCATION: SILC WORKSHOP
PROJECT DATE: MARCH 5, 2021 TO MARCH 19, 2021

DESCRIPTION OF JOB:

  • FABRICATION PIPE SPOOL 77 SPOOLS
  • WELDING  PIPE JOINT 242 JOINTS
  • HYDRO TESTING PIPE SPOOL 77 SPOOLS
  • TOTAL FIT-UP & WELD 477.50 DIA-INCH 

EXISTING PIPELINE TEMPLATE; RENEW, WELDING, AND HYDRO TESTING

NAME OF PROJECT: DWIPUTRI
LOCATION: SILC WORKSHOP
PROJECT DATE: 24.02.2021

DESCRIPTION OF JOB:

  • FABRICATION PIPE SPOOL 
  • WELDING  PIPE JOINT 
  • HYDRO TESTING PIPE 
  • TOTAL FIT-UP & WELD 2,544 DIA-INCH

PIPING FABRICATION, WELDING, AND HYDRO TESTING

NAME OF PROJECT: ACCOLADE-II
LOCATION: SILC WORKSHOP
PROJECT DATE: FEBRUARY 23, 2021 TO MARCH 15, 2021

DESCRIPTION OF JOB:

  • FABRICATION PIPE SPOOL 131 SPOOLS
  • WELDING  PIPE JOINT 651 JOINTS
  • HYDRO TESTING PIPE SPOOL 131 SPOOLS
  • TOTAL FIT-UP & WELD 1,812.25 DIA-INCH 

PIPING FABRICATION AND WELDING

NAME OF PROJECT: GASLOG SINGAPORE SS
LOCATION: SILC WORKSHOP
PROJECT DATE: DECEMBER 14, 2020 TO MARCH 15, 2021

DESCRIPTION OF JOB:

  • FABRICATION PIPE SPOOL 44 SPOOLS
  • WELDING  PIPE JOINT 183 JOINTS
  • TOTAL M/C BEND 38 DIA-INCH
  • TOTAL FIT-UP & WELD 1,085 DIA-INCH

PIPING FABRICATION, WELDING, HYDRO TESTING, AND RUBBER COATING

NAME OF PROJECT: GASLOG SINGAPORE CS
LOCATION: SILC WORKSHOP
PROJECT DATE: OCTOBER 19, 2020 TO NOVEMBER 19, 2020

DESCRIPTION OF JOB:

  • FABRICATION PIPE SPOOL 238 SPOOLS
  • WELDING  PIPE JOINT 825 JOINTS
  • HYDRO TESTING PIPE SPOOL 238 SPOOLS
  • TOTAL M/C BEND 51.25 DIA-INCH
  • TOTAL FIT-UP & WELD 6,256 DIA-INCH 

PIPING FABRICATION, WELDING, AND HYDRO TESTING

NAME OF PROJECT: LOBITO
LOCATION: SILC WORKSHOP
PROJECT DATE: AUGUST 13, 2020 TO SEPTEMBER 13, 2020

DESCRIPTION OF JOB:

  • FABRICATION PIPE SPOOL 118 SPOOLS
  • WELDING  PIPE JOINT 579 JOINTS
  • HYDRO TESTING PIPE SPOOL 118 SPOOLS
  • TOTAL WELDING 6,675.25 DIA-INCH

PIPING FABRICATION AND WELDING

NAME OF PROJECT: POLAR SPIRIT
LOCATION: SILC WORKSHOP
PROJECT DATE: AUGUST 4, 2020

DESCRIPTION OF JOB:

  • FABRICATION PIPE SPOOL 127 SPOOLS
  • WELDING  PIPE JOINT 534 JOINTS
  • TOTAL WELDING 5,388.25 DIA-INCH

PIPING FABRICATION AND WELDING

NAME OF PROJECT: SPIRIT OF HELA
LOCATION: SILC WORKSHOP
PROJECT DATE: JULY 19, 2020

DESCRIPTION OF JOB:

  • FABRICATION PIPE SPOOL 220 SPOOLS
  • WELDING  PIPE JOINT 1,983 JOINTS
  • HYDRO TESTING PIPE SPOOL 220 SPOOLS
  • TOTAL WELDING 7,611 DIA-INCH

PIPING FABRICATION AND WELDING

NAME OF PROJECT: GASLOG SENARRAH
LOCATION: SILC WORKSHOP
PROJECT DATE: 18.06.2020 TO 30.06.2020

DESCRIPTION OF JOB:

  • FABRICATION PIPE SPOOL
  • WELDING  PIPE JOINT
  • TOTAL WELDING 505 DIA-INCH

PIPING WORK - REMOVE FABRICATION AND INSTALL PIPES

NAME OF PROJECT: LNG SERI BEGAWAN
LOCATION: MMHE YARD
PROJECT DATE: 18.12.2019 TO 17.01.2020

DESCRIPTION OF JOB:

  • MAIN DECK PORT BUNKER PURGE LINE
  • MAIN DECK TRUNKWAY IMO LINE DRAIN
  • MAIN DECK N2 LINE
  • ENGINE ROOM DRAIN LINE
  • ENGINE DRAIN SYSTEM
  • MAIN DECK GLYCOL RESERVE TANK DRAINE

PIPE & FITTG - PIPING WORKS

NAME OF PROJECT: MV FORTE
LOCATION: MMHE YARD
PROJECT DATE: 06.12.2019 TO 05.03.2020

DESCRIPTION OF JOB:

  • ENGINE ROOM FRESH COOLING WATER SYSTEM (SUPPLY LINE)
  • THRUSTER ROOM (DOUBLE BOTTOM TANK BELOW 1,2) FRESH COOLING WATER SYSTEM
  • PROPULSION ROOM (ENGINE ROOM) FRESH WATER COOLING
  • ENGINE ROOM FRESH WATER COOLING SYSTEM (RETURN LINE)
  • THRUSTER ROOM FIRE – FIGHTING SYSTEM
  • ENGINE ROOM WORKING AIR
  • THRUSTER ROOM FOR THRUSTER HYDRAULIC SYSTEM
  • LEVER GAUGE (FOR BLACK WATER)

PIPING WORK - REMOVE FABRICATION AND INSTALL PIPES

NAME OF PROJECT: LNG SHEN HAI
LOCATION: MMHE YARD
PROJECT DATE: 05.10.2019 TO 30.10.2019

DESCRIPTION OF JOB:

  • ENGINE RROM / FRESH WATER PIPE
  • ENGINE ROOM / DRAIN LINE PIPE
  • ENGINE ROOM / BOTH FEED PUMP MODIFICATION PIPE
  • ENGINE ROOM / DB SEA WATER PIPE
  • ENGINE ROOM / DG COOLER PIPE (PORT)
  • ENGINE ROOM / DG COOLER PIPE (STBD)
  • ENGINE ROOM / AIR LINE PIPE (PORT)
  • ENGINE ROOM / AIR LINE PIPE (STBD)
  • ENGINE ROOM / EXHAUST PIPE
  • ENGINE ROOM / SEA WATER PIPE
  • ENGINE ROOM / STEAM LINE PIPE
  • ENGINE ROOM / BALLAST PIPE
  • ENGINE ROOM / HYDRAULIC PIPE
  • ENGINE ROOM / CONTROL AIR PIPE
  • ENGINE ROOM / EMERGENCY FIRE PUMP

PIPING WORK - CHANGE GASKET AT EXHAUST BELLOW ADTER TC

NAME OF PROJECT: BW PAVILLION VANDA
LOCATION: MMHE YARD
PROJECT DATE: 24.09.2019 TO 28.09.2019

DESCRIPTION OF JOB:

  • THE EXHAUST LINE BELLOW REMOVED, THE OLD GASKET REMOVED, SURFACE CLEANED AND INSPECTED
  • NEW GASKET INSERTED AND THE BELLOW INSTALLED BACK IN PLACE

PIPING WORK - REMOVE FABRICATION AND INSTALL PIPES

NAME OF PROJECT: MT BULL KANGEAN
LOCATION: MMHE YARD
PROJECT DATE: 22.09.2019 TO 02.10.2019

DESCRIPTION OF JOB: 

  • ENGINE ROOM / SEA WATER PIPE
  • ENGINE ROOM / SHAFT PIPING
  • MAIN DECK / IG LINE PIPE
  • MAIN DECK / STEAM LINE PIPE

PIPING WORK - REMOVE FABRICATION AND INSTALL FRESH WATER & SERVICE AIR PIPES

NAME OF PROJECT: LNG PELITA ENERGY
LOCATION: MMHE YARD
PROJECT DATE: 20.08.2019 TO 09.09.2019

DESCRIPTION OF JOB:

  • DECK / FRESH WATER PIPES
  • DECK / SERVICE AIR PIPES
  • DECK / SERVICE WATER PIPES

PIPING WORK - REMOVE AND TESTING CARGO TANK PIPES

NAME OF PROJECT: MTC LEDANG
LOCATION: MMHE YARD
PROJECT DATE: 17.08.2019 TO 10.11.2019

DESCRIPTION OF JOB:

  • ENGINE ROOM DIESEL OIL FILLING LINE PIPES
  • ENGINE ROOM DIESEL OIL SUCTION LINE PIPES
  • ENGINE ROOM DIESEL OIL OVER FLOW LINE PIPES
  • CO2 ROOM CO2 MANIFOLD PRESSURE TESTING
  • PUMP ROOM CO2 SYSTEM PIPES
  • ENGINE ROOM CO2 SYSTEM PIPES
  • MAIN DECK DIESEL OIL, AIR AND SOUNDING PIPES
  • MAIN DECK EXHAUST, HYDRAULIC, INSTRUMENT AIR

PIPING WORK

NAME OF PROJECT: BATTERSEA PARK
LOCATION: MMHE YARD
PROJECT DATE: 13.04.2017 TO 26.04.2017

DESCRIPTION OF JOB:

  • TO CARRY REMOVE, FABRICATE, REFIT PIPING WORK ONBOARD

PIPING WORK

NAME OF PROJECT: UNI FORTUNA
LOCATION: MMHE YARD
PROJECT DATE: 03.02.2017 TO 12.02.2017

DESCRIPTION OF JOB:

  • TO CARRY REMOVE, FABRICATE, REFIT PIPING WORK ONBOARD

PIPING WORK

NAME OF PROJECT: MT BRIGHTWAY
LOCATION: MMHE YARD
PROJECT DATE: 13.04.2017

DESCRIPTION OF JOB:

  • TO CARRY REMOVE, FABRICATE, REFIT PIPING WORK ONBOARD

PIPING WORK

NAME OF PROJECT: TILL JACOB
LOCATION: MMHE YARD
PROJECT DATE: 08.03.2017 TO 16.03.2017

DESCRIPTION OF JOB:

  • TO CARRY REMOVE, FABRICATE, REFIT PIPING WORK ONBOARD

PIPING WORK

NAME OF PROJECT: NAUTICA MUAR
LOCATION: MMHE YARD
PROJECT DATE: 05.01.2017 TO 10.02.2017

DESCRIPTION OF JOB:

  • TO CARRY REMOVE, FABRICATE, REFIT PIPING WORK ONBOARD