Golden Delta EngineeringANCHORAGE SHIP REPAIR
OUT FITTING & PIPING
NAME OF PROJECT: SEERE PIONEER
LOCATION: ANCHORAGE, JOHOR
PROJECT DATE: JUNE, 2023
DESCRIPTION OF JOB:
TO PROVIDE MANPOWER, TOOLS, AND MATERIAL TO COMPLETED FOLLOWING JOB:
- TO CUT, REMOVE AND FABRICATED, INSTALL NEW MILD STEEL AIR HON 1″ PIPE 5330MM.
- TO CUT, REMOVE AND FABRICATED, INSTALL NEW RAILING AND HANDRILL FORWARD CUSTLE : 30 NOS ROD BAR, 3000MM: 12 NOS PIPE.
- TO CUT, REMOVE AND FABRICATED, INSTALL NEW LADDER STEP MAIN DECK 21 NOS AND HANDRAIL LADDER.
- TO CUT, REMOVE AND FABRICATED, INSTALL NEW PLATFORM CHEQUE PLATE 600MM X 630MM X 3MM: 1 NOS.
- TO CUT, REMOVE AND FABRICATED, INSTALL NEW GRITING SUPPORT, ANGLE BAR 60 300MM.
- TO CUT, REMOVE AND FABRICATED, INSTALL NEW PIPE SUPPORT: 15 NOS.
- TO CUT, REMOVE AND FABRICATED, INSTALL NEW ANGLE BAR SUPPORT 1500MM: 4 NOS.
- TO CUT, REMOVE AND FABRICATED, INSTALL NEW WINCH FRAME PLATE 2000MM: 12 NOS.
- TO CUT, REMOVE AND FABRICATED, INSTALL NEW HYDRAULIC PIPE 1 1/4″,1/2″ : 3 LINE.
SHEAVE CRANE FOUNDATION
NAME OF PROJECT: M. T. STRAIT 3
LOCATION: ANCHORAGE, JOHOR
PROJECT DATE: 25 APRIL, 2023
DESCRIPTION OF JOB:
TO PROVIDE MANPOWER, TOOLS, CONSUMABLE, AND MATERIAL TO COMPLETED FOLLOWING JOB:
- TO REMOVE EXISTING SHEAVE CRANE AT OFFSHORE.
- TO FABRICATED AND INSTALL NEW SHEAVE CRANE AT OFFSHORE.
- TO INSTALL NEW PULLY 90MM OD WITH BRACKET ONE SET.
- TO REMOVE WIRE CRANE DAMAGE AND INSTALL NEW CLIP WIRE ROPE.
PIPING AND OUTFITTING WORK
NAME OF PROJECT: M. T. SMF IXORA
LOCATION: ANCHORAGE, JOHOR
PROJECT DATE: 09 FEBUARY, 2023
DESCRIPTION OF JOB:
TO PROVIDE MANPOWER, TOOLS, CONSUMABLE, AND MATERIAL TO COMPLETED FOLLOWING JOB:
- TO FABRICATE 9 SPOOL 5″ SEA WATER COOLING FOR MAIN ENGINE.
- TO DISMANTLE 9 SPOOL 5″ SEA WATER COOLING FOR MAIN ENGINE AT ENGINE ROOM BOTTOM LEVEL.
- TO INSTALL NEW 9 SPOOL 5″ SEA WATER COOLING FOR MAIN ENGINE AT ENGINE ROOM BOTTOM LEVEL.
- TO FABRICATE 1 SPOOL 3″ SEA WATER COOLING FOR MAIN ENGINE.
- TO INSTALL 1 SPOOL 3″ SEA WATER COOLING FOR MAIN ENGINE AT ENGINE ROOM BOTTOM LEVEL.
PIPING AND OUTFITTING WORK
NAME OF PROJECT: S.M.F. BEGONIA
LOCATION: ANCHORAGE, JOHOR
PROJECT DATE: 17 JANUARY, 2023
DESCRIPTION OF JOB:
TO PROVIDE MANPOWER, TOOLS, CONSUMABLE, AND MATERIAL TO COMPLETED FOLLOWING JOB:
- TO FABRICATE 10″ NEW SPOOL FOR SEA WATER COOLING STBD SIDE SEA CHEST
- TO FABRICATE 180mm*180mm*16mm DOUBLER PLATE
- TO REMOVE AND DISMANTLE DAMAGED 10″ SEA WATER COOLING AT ENGINE ROOM BOTTOM SEA CHEST AREA
- TO INSTALL NEW SPOOL 10″ SEA WATER COOLING AND DOUBLER PLATE AT ENGINE ROOM BOTTOM SEA CHEST AREA
PIPING AND OUTFITTING WORK
NAME OF PROJECT: M.T. STRAIT 3
LOCATION: ANCHORAGE, JOHOR
PROJECT DATE: DECEMBER 29, 2022
DESCRIPTION OF JOB:
TO PROVIDE MANPOWER, TOOLS, CONSUMABLE, AND MATERIAL TO COMPLETED FOLLOWING JOB:
- TO FABRICATE NEW PLATE 4 NOS FOR ANCHOR WINCH SUPPORT.
- TO INSTALL NEW PLATE 4 NOS FOR ANCHOR WINCH SUPPORT ON BOARD.
- TO DISMANTLE AND REMOVE EXISTING DAMAGE BREAK LINER FOR WINCH ANCHOR STBD SIDE
- TO INSTALL NEW BREAK LINER FOR WINCH ANCHOR STBD SIDE
PIPING AND OUTFITTING WORK
NAME OF PROJECT: M.T. EMPOWER
LOCATION: ANCHORAGE, JOHOR
PROJECT DATE: DECEMBER 9, 2022
DESCRIPTION OF JOB:
TO PROVIDE MANPOWER, TOOLS, CONSUMABLE AND MATERIAL TO COMPLETED FOLLOWING WORK:
- TO DISMANTLE DAMAGED PIPE SPOOL FOR SEA WATER COOLING AND AIR COND LINE: 9 SPOOL.
- TO INSTALL SEA WATER COOLING LINE FOR GENERATOR NO.1: ONE SPOOL
- TO INSTALL SEA WATER COOLING LINE FOR GENERATOR NO.3: PORT SIDE: 5 SPOOL
- TO INSTALL SEA WATER COOLING LINE FOR GENERATOR NO.2: STBD SIDE: 2 SPOOL
- TO INSTALL AIR COND LINE AT ENGINE CONTROL ROOM SIDE: 1 SPOOL
PIPING AND OUTFITTING WORK
NAME OF PROJECT: M.T. EDEN
LOCATION: ANCHORAGE, JOHOR
PROJECT DATE: OCTOBER 21, 2022
DESCRIPTION OF JOB:
TO PROVIDE MANPOWER, TOOLS, AND MATERIAL TO COMPLETED FOLLOWING WORK:
- TO REMOVE DAMAGED SPOOL STORAGE SYSTEM: 4 SPOOL
- TO REMOVE DAMAGED SPOOL FUEL OIL SYSTEM: 1 SPOOL
- TO REMOVE DAMAGED BULKHEAD PLATE: 2PCS
- TO FABRICATE AND INSTALL NEW SPOOL STORAGE SYSTEM AT ENGINE ROOM: 4 SPOOL
- TO FABRICATE AND INSTALL FUEL OIL SYSTEM AT ENGINE ROOM: 1 SPOOL
- TO FABRICATE AND INSTALL ANCHOR SPRAY SYSTEM AT FUEL STORE ROOM: 6 SPOOL
- TO FABRICATE AND INSTALL NEW PLATE AT ENGINE ROOM AT DECK: 2PCS
- TO REMOVE DAMAGED AND INSTALL NEW HANDRAILING AT DECK PORT AND STBD: 48 METER
- TO REMOVE DAMAGED DRAIN LINE AT DECK: 8 SPOOL AND 2PCS VALVE
- TO INSTALL ONE PIPE HANDRAILING AT LIFE BOT AT PORT SIDE
- TO FABRICATE AND INSTALL NEW DRAIN LINE AT DECK: 8 SPOOL AND 2 PCS VALVE AND 5 PIPE SUPPORT
- TO RE-WELD ALL FIRE HYDRANT VALVE HANDLE AT DECK
- TO RE-WELD DAMAGED WELDING JOINT FOR TANK MANHOLE
OUT FITTING WORK
NAME OF PROJECT: M.T. EMPOWER
LOCATION: ANCHORAGE, JOHOR
PROJECT DATE: OCTOBER 5, 2022
DESCRIPTION OF JOB:
- TO PROVIDE MANPOWER, TOOLS, MATERIAL, AND CONSUMABLE
- TO REMOVE DAMAGED 5″ PIPE SPOOL SWC AT ENGINE ROOM: 4 SPOOLS
- TO REMOVE DAMAGED 2″ PIPE SPOOL SWC AT ENGINE ROOM: 2 SPOOLS
- TO FABRICATED AND INSTALL NEW 5″ PIPE SPOOL AT ENGINE ROOM: 4 SPOOLS
- TO FABRICATED AND INSTALL NEW 2″ PIPE SPOOL AT ENGINE ROOM: 2 SPOOLS
OUT FITTING WORK
NAME OF PROJECT: M.T. EMPOWER
LOCATION: ANCHORAGE, JOHOR
PROJECT DATE: SEPTEMBER 6, 2022
DESCRIPTION OF JOB:
- TO PROVIDE MANPOWER, TOOLS & MATERIAL
- TO CUT AND REMOVE EXISTING DAMAGE HANDRAIL AT PORT SIDE FWD (14 METER).
- TO FABRICATE AND INSTALL NEW HANDRAIL AT PORT SIDE FWD (14 METER).
- TO CUT AND REMOVE EXISTING DAMAGE ANCHOR WINCH STOPPER (PORT SIDE).
- TO FABRICATE AND INSTALL NEW ANCHOR WINCH STOPPER (PORT SIDE).
OUT FITTING WORK
NAME OF PROJECT: M.T. EMPOWER
LOCATION: ANCHORAGE, JOHOR
PROJECT DATE: AUGEST 28, 2022
DESCRIPTION OF JOB:
- TO PROVIDE MANPOWER, TOOLS & MATERIAL
- TO REMOVE EXISTING DAMAGE FAIRLEAD GUARD AT STBD SIDE FWD
- TO FABRICATED AND INSTALL NEW FAIRLEAD GUARD AT STBD SIDE FWD
- TO CUT AND REMOVE EXISTING DAMAGE FAIRLEAD GUARDRAIL AT STBD SIDE FWD
- TO FABRICATE AND INSTALL NEW FAIRLEAD GUARDRAIL AT STBD SIDE FWD
PIPING AND OUT FITTING WORK
NAME OF PROJECT: M.T. STRAIT 3
LOCATION: ANCHORAGE, JOHOR
PROJECT DATE: AUGEST 16, 2022
DESCRIPTION OF JOB:
- TO PROVIDE MANPOWER, TOOLS AND MATERIAL
- TO CHANGE NEW FORECASTLE LADDER STEPS (PORT SIDE) AND RENEW FORECASTLE LADDER (STBD SIDE)
- TO RENEW FORECASTLE FAIRLEAD GUARD RAIL (PORT SIDE)
- TO ADD NEW PLATE AT MAIN DECK FOR FLOW METER STAND (STBD SIDE)
- TO RENEW MAIN DECK LADDER STEPS (ACCOMMODATION ENTRANCE) (PORT & STBD)
- TO RENEW MAIN DECK LADDER STEP NEAR PILOT EMBARKATION STATION
PIPING AND OUT FITTING WORK
NAME OF PROJECT: M.T. STRAIT 3
LOCATION: ANCHORAGE, JOHOR
PROJECT DATE: AUGUST 11, 2022
DESCRIPTION OF JOB:
- MAIN ENGINE SEA WATER PUMP PIPE SUCTION LINE, 1 SPOOL
- NO.2 (STBD) GENERATOR SEA WATER PIPE, 1 SPOOL
PIPING AND OUT FITTING WORK
NAME OF PROJECT: M.T. STRAIT 3
LOCATION: ANCHORAGE, JOHOR
PROJECT DATE: AUGUST 10, 2022
DESCRIPTION OF JOB:
- MAIN ENGINE GEAR BOX SEA WATER PIPE, 1 SPOOL
- MAIN ENGINE SEA WATER PUMP PIPE, 1 SPOOL
- NO.1 (STEEL) GENERATOR FW COOLER SEA WATER PIPE, 1 SPOOL
- NO.2 (PORT) GENERATOR FW COOLER SEA WATER PIPE, 1 SPOOL
- NO.2 (PORT) GENERATOR SEA WATER OVERBOARD PIPE, 1 SPOOL
- SANITARY SEA WATER INLET PIPE, 1 SPOOL
- SANITARY STBD WATER OVERBOARD PIPE, 1 SPOOL
- EMERGENCY FIRE PUMP TO TANK UNIT PIPE, 2 SPOOL
- DIRTY OIL DISCHARGE PIPE, 3 SPOOL
- AIR-CONDITION CONDENSER SEA WATER COOLING PIPE, 3 SPOOL
PIPING AND OUT FITTING WORK
NAME OF PROJECT: M.T CAVALLA
LOCATION: ANCHORAGE, JOHOR
PROJECT DATE: JUNE 26, 2022
DESCRIPTION OF JOB:
- TO REMOVE DAMAGE HANDRIL AND TO FABRICATED AND INSTALL NEWS HANDRILL ROD BAR 3623 MM
- TO REMOVE DAMAGE FEALER GUARD RILL AND TO FABRICATED AND INSTALL NEWS FEALER GUARDRILL
- TO REMOVE DAMAGE 1 1/2″ PIPE DO TANK VENT AT AND TO FABRICATED AND INSTALL NEWS 1 1/2″ PIPE DO TANK VENT
PIPING AND OUT FITTING WORK
NAME OF PROJECT: M.T. PHOENIX
LOCATION: ANCHORAGE, JOHOR
PROJECT DATE: MAY 29, 2022
DESCRIPTION OF JOB:
- TO FABRICATE AND INSTALL NEW CARGO LINE PIPE AT PORT SIDE
- TO RE-WELDING EXISTING FAIRLEAD ROLLER
- TO FABRICATE AND INSTALL NEW SEA WATER PIPE AT ENGINE ROOM
- TO MODIFIED SPOTLIGHT STAND AT RIDE DECK
PIPING WORK
NAME OF PROJECT: M.T. CAVALLA
LOCATION: ANCHORAGE, JOHOR
PROJECT DATE: MARCH 29, 2022
DESCRIPTION OF JOB:
- TO FABRICATE AND INSTALL NEW PIPE SPOOL FOR COOLER TO OVER BOARD AT ENGINE ROOM (2600mm)
- TO FABRICATE AND INSTALL NEW SOUNDING PIPE AT POOP DECK
OUT FITTING WORK
NAME OF PROJECT: M.T. BEGONIA
LOCATION: ANCHORAGE, JOHOR
PROJECT DATE: MARCH 21, 2022
DESCRIPTION OF ADDITIONAL JOB:
- TO WELDING 2 PCS PAD EYE AT ENGINE ROOM
PIPING AND OUT FITTING WORK
NAME OF PROJECT: M.T. BEGONIA
LOCATION: ANCHORAGE, JOHOR
PROJECT DATE: MARCH 21, 2022
DESCRIPTION OF JOB:
- TO INSTALL ONE SPOOL SEA WATER PIPE AT FWD STBD ANCHOR
- TO CUT AND REMOVE EXISTING DAMAGE 2” PIPE FUEL OIL AND INSTALL NEW SPOOL 2” AT MAIN DECK PORT SIDE
- TO INSTALL NEW PLATEFORM AT LIFE BOAT PORT SIDE AND STBD SIDE
PIPING AND OUT FITTING WORK
NAME OF PROJECT: M.T. PHOENIX
LOCATION: ANCHORAGE, JOHOR
PROJECT DATE: MARCH 14, 2022
DESCRIPTION OF ADDITIONAL JOB:
- TO REPAIR LIFE SUOY LIGHT HOLDER AT FWD ANCHOR PORT & STBO 6 NOS
- TO CUT AND REMOVE EXISTING LIVE BOAT RACK AND INSTALL NEW ONE
- TO INSTALL WINCH BRAKE SUPPORT FRAME
PIPING AND STEEL WORK
NAME OF PROJECT: M.T. STRAIT 3
LOCATION: ANCHORAGE, JOHOR
PROJECT DATE: MARCH 14, 2022
DESCRIPTION OF JOB:
- TO REMOVE EXISTING STBD ANCHOR BROKEN ON BOARD AND INSTALL NEW ONE
- TO REMOVE EXISTING 4″ PIPE SEA WATER 500MM ON BOARD AND INSTALL NEW ONE
- TO CUT AND REWELD 3″ VENT PIPE ON BOARD
PIPING AND OUT FITTING WORK
NAME OF PROJECT: M.T. PHOENIX
LOCATION: ANCHORAGE, JOHOR
PROJECT DATE: MARCH 14, 2022
DESCRIPTION OF JOB:
- TO CUT, REMOVE EXISTING DAMAGE HANDRALL, HOSERACK, THREADED PIPE AND INSTALL NEW AT FORWORD SIDE, PORT SIDE AND STERN AREA
- TO INSTALL NEW STEP LADDER AND WELDING NEW STEP LADDER PLATE, NEW SAFETY LIGHT BRACKET
- TO CUT, REMOVE EXISTING DAMAGE 2 1/2” THREADED PIPE (200MM), INSTALL AND RE-WELDING NEW 2 1/2” THREADED PIPE (200MM)
WINCH REPAIR WORK
NAME OF PROJECT: M.T. SIERRA PIONEER
LOCATION: ANCHORAGE, JOHOR
PROJECT DATE: FEBRUARY 22, 2022
DESCRIPTION OF JOB:
- TO WELDING PLATE 30MM X 80MM X 10MM AT FWD WINCH ANCHOR CHAIN CONTROL STOPPER
- TO BUILT UP WELDING AT CHAIN CONTROL STOPPER