NAME OF PROJECT: SEERE PIONEER
LOCATION: ANCHORAGE, JOHOR
PROJECT DATE: JUNE, 2023

DESCRIPTION OF JOB:

TO PROVIDE MANPOWER, TOOLS, AND MATERIAL TO COMPLETED FOLLOWING JOB:

  • TO CUT, REMOVE AND FABRICATED, INSTALL NEW MILD STEEL AIR HON 1″ PIPE 5330MM.
  • TO CUT, REMOVE AND FABRICATED, INSTALL NEW RAILING AND HANDRILL FORWARD CUSTLE : 30 NOS ROD BAR, 3000MM: 12 NOS PIPE.
  • TO CUT, REMOVE AND FABRICATED, INSTALL NEW LADDER STEP MAIN DECK 21 NOS AND HANDRAIL LADDER.
  • TO CUT, REMOVE AND FABRICATED, INSTALL NEW PLATFORM CHEQUE PLATE 600MM X 630MM X 3MM: 1 NOS.
  • TO CUT, REMOVE AND FABRICATED, INSTALL NEW GRITING SUPPORT, ANGLE BAR 60 300MM.
  • TO CUT, REMOVE AND FABRICATED, INSTALL NEW PIPE SUPPORT: 15 NOS.
  • TO CUT, REMOVE AND FABRICATED, INSTALL NEW ANGLE BAR SUPPORT 1500MM: 4 NOS.
  • TO CUT, REMOVE AND FABRICATED, INSTALL NEW WINCH FRAME PLATE 2000MM: 12 NOS.
  • TO CUT, REMOVE AND FABRICATED, INSTALL NEW HYDRAULIC PIPE 1 1/4″,1/2″ : 3 LINE.

SHEAVE CRANE FOUNDATION

NAME OF PROJECT: M. T. STRAIT 3
LOCATION: ANCHORAGE, JOHOR
PROJECT DATE: 25 APRIL, 2023

DESCRIPTION OF JOB:

TO PROVIDE MANPOWER, TOOLS, CONSUMABLE, AND MATERIAL TO COMPLETED FOLLOWING JOB:

  • TO REMOVE EXISTING SHEAVE CRANE AT OFFSHORE.
  • TO FABRICATED AND INSTALL NEW SHEAVE CRANE AT OFFSHORE.
  • TO INSTALL NEW PULLY 90MM OD WITH BRACKET ONE SET.
  • TO REMOVE WIRE CRANE DAMAGE AND INSTALL NEW CLIP WIRE ROPE.

PIPING AND OUTFITTING WORK

NAME OF PROJECT: M. T. SMF IXORA
LOCATION: ANCHORAGE, JOHOR
PROJECT DATE: 09 FEBUARY, 2023

DESCRIPTION OF JOB:

TO PROVIDE MANPOWER, TOOLS, CONSUMABLE, AND MATERIAL TO COMPLETED FOLLOWING JOB:

  • TO FABRICATE 9 SPOOL 5″ SEA WATER COOLING FOR MAIN ENGINE.
  • TO DISMANTLE 9 SPOOL 5″ SEA WATER COOLING FOR MAIN ENGINE AT ENGINE ROOM BOTTOM LEVEL.
  • TO INSTALL NEW 9 SPOOL 5″ SEA WATER COOLING FOR MAIN ENGINE AT ENGINE ROOM BOTTOM LEVEL.
  • TO FABRICATE 1 SPOOL 3″ SEA WATER COOLING FOR MAIN ENGINE.
  • TO INSTALL 1 SPOOL 3″ SEA WATER COOLING FOR MAIN ENGINE AT ENGINE ROOM BOTTOM LEVEL.

PIPING AND OUTFITTING WORK

NAME OF PROJECT: S.M.F. BEGONIA
LOCATION: ANCHORAGE, JOHOR
PROJECT DATE: 17 JANUARY, 2023

DESCRIPTION OF JOB:

TO PROVIDE MANPOWER, TOOLS, CONSUMABLE, AND MATERIAL TO COMPLETED FOLLOWING JOB:

  • TO FABRICATE 10″ NEW SPOOL FOR SEA WATER COOLING STBD SIDE SEA CHEST
  • TO FABRICATE 180mm*180mm*16mm DOUBLER PLATE
  • TO REMOVE AND DISMANTLE DAMAGED 10″ SEA WATER COOLING AT ENGINE ROOM BOTTOM SEA CHEST AREA
  • TO INSTALL NEW SPOOL 10″ SEA WATER COOLING AND DOUBLER PLATE AT ENGINE ROOM BOTTOM SEA CHEST AREA

PIPING AND OUTFITTING WORK

NAME OF PROJECT: M.T. STRAIT 3
LOCATION: ANCHORAGE, JOHOR
PROJECT DATE: DECEMBER 29, 2022

DESCRIPTION OF JOB:

TO PROVIDE MANPOWER, TOOLS, CONSUMABLE, AND MATERIAL TO COMPLETED FOLLOWING JOB:

  • TO FABRICATE NEW PLATE 4 NOS FOR ANCHOR WINCH SUPPORT.
  • TO INSTALL NEW PLATE 4 NOS FOR ANCHOR WINCH SUPPORT ON BOARD.
  • TO DISMANTLE AND REMOVE EXISTING DAMAGE BREAK LINER FOR WINCH ANCHOR STBD SIDE
  • TO INSTALL NEW BREAK LINER FOR WINCH ANCHOR STBD SIDE

PIPING AND OUTFITTING WORK

NAME OF PROJECT: M.T. EMPOWER
LOCATION: ANCHORAGE, JOHOR
PROJECT DATE: DECEMBER 9, 2022

DESCRIPTION OF JOB:

TO PROVIDE MANPOWER, TOOLS, CONSUMABLE AND MATERIAL TO COMPLETED FOLLOWING WORK:

  • TO DISMANTLE DAMAGED PIPE SPOOL FOR SEA WATER COOLING AND AIR COND LINE: 9 SPOOL.
  • TO INSTALL SEA WATER COOLING LINE FOR GENERATOR NO.1: ONE SPOOL
  • TO INSTALL SEA WATER COOLING LINE FOR GENERATOR NO.3: PORT SIDE: 5 SPOOL
  • TO INSTALL SEA WATER COOLING LINE FOR GENERATOR NO.2: STBD SIDE: 2 SPOOL
  • TO INSTALL AIR COND LINE AT ENGINE CONTROL ROOM SIDE: 1 SPOOL

PIPING AND OUTFITTING WORK

NAME OF PROJECT: M.T. EDEN
LOCATION: ANCHORAGE, JOHOR
PROJECT DATE: OCTOBER 21, 2022

DESCRIPTION OF JOB:

TO PROVIDE MANPOWER, TOOLS, AND MATERIAL TO COMPLETED FOLLOWING WORK:

  • TO REMOVE DAMAGED SPOOL STORAGE SYSTEM: 4 SPOOL
  • TO REMOVE DAMAGED SPOOL FUEL OIL SYSTEM: 1 SPOOL
  • TO REMOVE DAMAGED BULKHEAD  PLATE: 2PCS
  • TO FABRICATE AND INSTALL NEW SPOOL STORAGE SYSTEM AT ENGINE ROOM: 4 SPOOL
  • TO FABRICATE AND INSTALL FUEL OIL SYSTEM AT ENGINE ROOM: 1 SPOOL
  • TO FABRICATE AND INSTALL ANCHOR SPRAY SYSTEM AT FUEL STORE ROOM: 6 SPOOL
  • TO FABRICATE AND INSTALL NEW PLATE AT ENGINE ROOM AT DECK: 2PCS
  • TO REMOVE DAMAGED AND INSTALL NEW HANDRAILING AT DECK PORT AND STBD: 48 METER
  • TO REMOVE DAMAGED DRAIN LINE AT DECK: 8 SPOOL AND 2PCS VALVE
  • TO INSTALL ONE PIPE HANDRAILING AT LIFE BOT AT PORT SIDE
  • TO FABRICATE AND INSTALL NEW DRAIN LINE AT DECK: 8 SPOOL AND 2 PCS VALVE AND 5 PIPE SUPPORT
  • TO RE-WELD ALL FIRE HYDRANT VALVE HANDLE AT DECK
  • TO RE-WELD DAMAGED WELDING JOINT FOR TANK MANHOLE

OUT FITTING WORK

NAME OF PROJECT: M.T. EMPOWER
LOCATION: ANCHORAGE, JOHOR
PROJECT DATE: OCTOBER 5, 2022

DESCRIPTION OF JOB:

  • TO PROVIDE MANPOWER, TOOLS, MATERIAL, AND CONSUMABLE
  • TO REMOVE DAMAGED 5″ PIPE SPOOL SWC AT ENGINE ROOM: 4 SPOOLS
  • TO REMOVE DAMAGED 2″ PIPE SPOOL SWC AT ENGINE ROOM: 2 SPOOLS
  • TO FABRICATED AND INSTALL NEW 5″ PIPE SPOOL AT ENGINE ROOM: 4 SPOOLS
  • TO FABRICATED AND INSTALL NEW 2″ PIPE SPOOL AT ENGINE ROOM: 2 SPOOLS
Picture3

OUT FITTING WORK

NAME OF PROJECT: M.T. EMPOWER
LOCATION: ANCHORAGE, JOHOR
PROJECT DATE: SEPTEMBER 6, 2022

DESCRIPTION OF JOB:

  • TO PROVIDE MANPOWER, TOOLS & MATERIAL
  • TO CUT AND REMOVE EXISTING DAMAGE HANDRAIL AT PORT SIDE FWD (14 METER).
  • TO FABRICATE AND INSTALL NEW HANDRAIL AT PORT SIDE FWD (14 METER).
  • TO CUT AND REMOVE EXISTING DAMAGE ANCHOR WINCH STOPPER (PORT SIDE).
  • TO FABRICATE AND INSTALL NEW ANCHOR WINCH STOPPER (PORT SIDE).

OUT FITTING WORK

NAME OF PROJECT: M.T. EMPOWER
LOCATION: ANCHORAGE, JOHOR
PROJECT DATE: AUGEST 28, 2022

DESCRIPTION OF JOB:

  • TO PROVIDE MANPOWER, TOOLS & MATERIAL
  • TO REMOVE EXISTING DAMAGE FAIRLEAD GUARD AT STBD SIDE FWD
  • TO FABRICATED AND INSTALL NEW FAIRLEAD GUARD AT STBD SIDE FWD
  • TO CUT AND REMOVE EXISTING DAMAGE FAIRLEAD GUARDRAIL AT STBD SIDE FWD
  • TO FABRICATE AND INSTALL NEW FAIRLEAD GUARDRAIL AT STBD SIDE FWD

PIPING AND OUT FITTING WORK

NAME OF PROJECT: M.T. STRAIT 3
LOCATION: ANCHORAGE, JOHOR
PROJECT DATE: AUGEST 16, 2022

DESCRIPTION OF JOB:

  • TO PROVIDE MANPOWER, TOOLS AND MATERIAL
  • TO CHANGE NEW FORECASTLE LADDER STEPS (PORT SIDE) AND RENEW FORECASTLE LADDER (STBD SIDE)
  • TO RENEW FORECASTLE FAIRLEAD GUARD RAIL (PORT SIDE)
  • TO ADD NEW PLATE AT MAIN DECK FOR FLOW METER STAND (STBD SIDE)
  • TO RENEW MAIN DECK LADDER STEPS (ACCOMMODATION ENTRANCE) (PORT & STBD)
  • TO RENEW MAIN DECK LADDER STEP NEAR PILOT EMBARKATION STATION

PIPING AND OUT FITTING WORK

NAME OF PROJECT: M.T. STRAIT 3
LOCATION: ANCHORAGE, JOHOR
PROJECT DATE: AUGUST 11, 2022

DESCRIPTION OF JOB:

  • MAIN ENGINE SEA WATER PUMP PIPE SUCTION LINE, 1 SPOOL
  • NO.2 (STBD) GENERATOR SEA WATER PIPE, 1 SPOOL

PIPING AND OUT FITTING WORK

NAME OF PROJECT: M.T. STRAIT 3
LOCATION: ANCHORAGE, JOHOR
PROJECT DATE: AUGUST 10, 2022

DESCRIPTION OF JOB:

  • MAIN ENGINE GEAR BOX SEA WATER PIPE, 1 SPOOL
  • MAIN ENGINE SEA WATER PUMP PIPE, 1 SPOOL
  • NO.1 (STEEL) GENERATOR FW COOLER SEA WATER PIPE, 1 SPOOL
  • NO.2 (PORT) GENERATOR FW COOLER SEA WATER PIPE, 1 SPOOL
  • NO.2 (PORT) GENERATOR SEA WATER OVERBOARD PIPE, 1 SPOOL
  • SANITARY SEA WATER INLET PIPE, 1 SPOOL
  • SANITARY STBD WATER OVERBOARD PIPE, 1 SPOOL
  • EMERGENCY FIRE PUMP TO TANK UNIT PIPE, 2 SPOOL
  • DIRTY OIL DISCHARGE PIPE, 3 SPOOL
  • AIR-CONDITION CONDENSER SEA WATER COOLING PIPE, 3 SPOOL

PIPING AND OUT FITTING WORK

NAME OF PROJECT: M.T CAVALLA
LOCATION: ANCHORAGE, JOHOR
PROJECT DATE: JUNE 26, 2022

DESCRIPTION OF JOB:

  • TO REMOVE DAMAGE HANDRIL AND TO FABRICATED AND INSTALL NEWS HANDRILL ROD BAR 3623 MM
  • TO REMOVE DAMAGE FEALER GUARD RILL AND TO FABRICATED AND INSTALL NEWS FEALER GUARDRILL
  • TO REMOVE DAMAGE 1 1/2″ PIPE DO TANK VENT AT AND TO FABRICATED AND INSTALL NEWS 1 1/2″ PIPE DO TANK VENT 

PIPING AND OUT FITTING WORK

NAME OF PROJECT: M.T. PHOENIX
LOCATION: ANCHORAGE, JOHOR
PROJECT DATE: MAY 29, 2022

DESCRIPTION OF JOB:

  • TO FABRICATE AND INSTALL NEW CARGO LINE PIPE AT PORT SIDE
  • TO RE-WELDING EXISTING FAIRLEAD ROLLER
  • TO FABRICATE AND INSTALL NEW SEA WATER PIPE AT ENGINE ROOM
  • TO MODIFIED SPOTLIGHT STAND AT RIDE DECK

PIPING WORK

NAME OF PROJECT: M.T. CAVALLA
LOCATION: ANCHORAGE, JOHOR
PROJECT DATE: MARCH 29, 2022

DESCRIPTION OF JOB:

  • TO FABRICATE AND INSTALL NEW PIPE SPOOL FOR COOLER TO OVER BOARD AT ENGINE ROOM (2600mm)
  • TO FABRICATE AND INSTALL NEW SOUNDING PIPE AT POOP DECK

OUT FITTING WORK

NAME OF PROJECT: M.T. BEGONIA
LOCATION: ANCHORAGE, JOHOR
PROJECT DATE: MARCH 21, 2022

DESCRIPTION OF ADDITIONAL JOB:

  • TO WELDING 2 PCS PAD EYE AT ENGINE ROOM

PIPING AND OUT FITTING WORK

NAME OF PROJECT: M.T. BEGONIA
LOCATION: ANCHORAGE, JOHOR
PROJECT DATE: MARCH 21, 2022

DESCRIPTION OF JOB:

  • TO INSTALL ONE SPOOL SEA WATER PIPE AT FWD STBD ANCHOR
  • TO CUT AND REMOVE EXISTING DAMAGE 2” PIPE FUEL OIL AND INSTALL NEW SPOOL 2” AT MAIN DECK PORT SIDE
  • TO INSTALL NEW PLATEFORM AT LIFE BOAT PORT SIDE AND STBD SIDE

PIPING AND OUT FITTING WORK

NAME OF PROJECT: M.T. PHOENIX
LOCATION: ANCHORAGE, JOHOR
PROJECT DATE: MARCH 14, 2022

DESCRIPTION OF ADDITIONAL JOB:

  • TO REPAIR LIFE SUOY LIGHT HOLDER AT FWD ANCHOR PORT & STBO 6 NOS
  • TO CUT AND REMOVE EXISTING LIVE BOAT RACK AND INSTALL NEW ONE
  • TO INSTALL WINCH BRAKE SUPPORT FRAME

PIPING AND STEEL WORK

NAME OF PROJECT: M.T. STRAIT 3
LOCATION: ANCHORAGE, JOHOR
PROJECT DATE: MARCH 14, 2022

DESCRIPTION OF JOB:

  • TO REMOVE EXISTING STBD ANCHOR BROKEN ON BOARD AND INSTALL NEW ONE
  • TO REMOVE EXISTING 4″ PIPE SEA WATER 500MM ON BOARD AND INSTALL NEW ONE
  • TO CUT AND REWELD 3″ VENT PIPE ON BOARD

PIPING AND OUT FITTING WORK

NAME OF PROJECT: M.T. PHOENIX
LOCATION: ANCHORAGE, JOHOR
PROJECT DATE: MARCH 14, 2022

DESCRIPTION OF JOB:

  • TO CUT, REMOVE EXISTING DAMAGE HANDRALL, HOSERACK, THREADED PIPE AND INSTALL NEW AT FORWORD SIDE, PORT SIDE AND STERN AREA
  • TO INSTALL NEW STEP LADDER AND WELDING NEW STEP LADDER PLATE, NEW SAFETY LIGHT BRACKET
  • TO CUT, REMOVE EXISTING DAMAGE 2 1/2” THREADED PIPE (200MM), INSTALL AND RE-WELDING NEW 2 1/2” THREADED PIPE (200MM)

OUT FITTING JOB

NAME OF PROJECT: M.T. EDEN
LOCATION: ANCHORAGE, JOHOR
PROJECT DATE: MARCH 7, 2022

DESCRIPTION OF JOB:

  • CARRY OUT HAND RAILING WORK ONBOARD FOR THE PROJECT OF M.T EDEN

WINCH REPAIR WORK

NAME OF PROJECT: M.T. SIERRA PIONEER
LOCATION: ANCHORAGE, JOHOR
PROJECT DATE: FEBRUARY 22, 2022

DESCRIPTION OF JOB:

  • TO WELDING PLATE 30MM X 80MM X 10MM AT FWD WINCH ANCHOR CHAIN CONTROL STOPPER
  • TO BUILT UP WELDING AT CHAIN CONTROL STOPPER

PIPING AND OUT FITTING WORK

NAME OF PROJECT: M.T. EDEN
LOCATION: ANCHORAGE, JOHOR
PROJECT DATE: AUGUST 2021

DESCRIPTION OF JOB:

  • TO CARRY REMOVE,FABRICATE AND REFIT PIPING WORK ON BOARD AT PTP ANCHORAGE